Friday, January 2, 2009

Tim's Bathroom Update

No, not THAT kind of bathroom update. Ewwww. This is a family blog. No, Tim has been kind enough to type up a report of all the work he's done at the farmhouse over the last 9 months, and I'm just now getting around to posting it for him. The bathroom was finished to this point by late summer; he's been working on the kitchen and back porch (3/4 bath, laundry, pantry) since fall, so watch for future updates!

Remodel efforts started in earnest early in the spring. Top propriety was to get a functioning bathroom. There is a usable outhouse on the property, but the girls could really not come up for the day and help me. From what we have been able to find out so far, the house was built pre-1900’s. It is a post and beam construction house with outside plank walls. There are 2” thick planks that run on the outside of the house from top to bottom and 1” thick planks on the inside from floor to ceiling; no studs. The only insulation was newspaper between the planks. The plan is to leave the planks and build 2X6 framed walls on the inside of all the exterior walls. This will allow space for new wiring, plumbing and insulation. We will also be installing new windows and doors.

The bathroom was in pretty rough shape. It appeared that the outhouse got more use than the bathroom. The cast iron bathtub was hauled out to the side porch (still sitting there – anyone want a cast iron bathtub?!?) and the toilet came out in pieces. We submitted a new layout to the landlords, which they approved. It was roughly the same layout except we rotated the tub 180 degrees and added a large closet. The bathroom is roughly 8X10. We started with the rough framing, then installed the tub. Next was the new window. My brother Matt was gracious enough to take a break from his new home construction to help me install the window. Nephew Camden came along to make sure he fully understood what we were doing. The windows are new construction windows, which are a little bigger than the existing window. We had to cut the planks to increase the rough window opening. We then framed in the rough window opening using 2X10’s. Once that was completed the window fit right into place. Because we are building the walls out we are going to have very deep window sills.

The next order of business was the rough wiring and plumbing. Once the rough-ins were completed, we put in the insulation and then up went the drywall. Next I mudded and sanded and mudded and sanded and mudded and sanded. Once the mudding and sanding were done we tackled tiling the tub surround. This is the first time that I have tiled and JJ and I were both pleased with the end result. JJ’s dad helped out with this, as well as a lot of other things along the way. We then painted the walls and installed the flooring. Once the flooring was down we could put the toilet and vanity in…and Voila! FUNCTIONING BATHROOM. We completed the electrical as well as the hook ups to the tub/shower. We also put some of the trim up but we then stopped there to move onto the kitchen.

Monday, December 29, 2008

maybe...someday?

I desperately need to update this poor, sad, lonely blog. I am making it my New Year's Resolution. Someone please hold me to it!

Monday, July 14, 2008

Goofy Glasses!

The girls and I spent a rainy Sunday afternoon working on this silly craft:

Monday, March 3, 2008

Our Dream Come True

It's official and I can finally share our big news! We're going to be moving. It's been a long time in the works, but suffice it to say that we will be renting and remodeling a farmhouse on the Loyalsock Creek, 12 miles north of civilization. The house sits on a cleared lot about 400 yards away from the creek, and is surrounded by timberland. You can't see a neighbor from anywhere in or around the house -- a far cry from our tiny city property with streets and alleys on three sides! The hiking and fishing opportunities here are endless. The landlords are fine with us using the outbuildings, having animals (chickens are definitely in the plan) and planting a big garden, and we're looking forward to the significant lifestyle change that this move will bring.

The house needs a vast amount of work -- right now it has no heat, no insulation, no bathroom and no kitchen to speak of. It's going to be an ongoing long-long-long-term project, but we're hoping it will be habitable by summer so that we can move in and put our house on the market. It's going to be interesting to be renters again, but it will be worth it in so many ways. There's something pretty to look at from every window in the house. I can't wait for our friends and family to see it firsthand. We are so blessed!

Thursday, February 7, 2008

The Year of the Rat begins today,
February 7th, 2008.
May it be prosperous and joyful for you and your family!


Wednesday, February 6, 2008

More Cards - Mojo Madness 22




Here are some cards that are very roughly based on Julee's Mojo Madness 22 sketch (of course I'm a week behind!). I've really enjoyed using the complimentary designer papers this way. Fun stuff!

Sunday, February 3, 2008

Weekend Sketch Challenge

This may be just what I needed to get inspired to blog more. I've started using the sketch challenges from SplitCoast and its contributors to inspire my stamping. I completed Beate's Weekend Sketch Challenge yesterday and like it enough to post and share.

All stamps are from the One of a Kind set. Base is Ruby Red; also includes So Saffron, More Mustard, Ballet Blue and DP is Passionnant by Francis Meyer (I love this!). Background on the So Saffron is the trio of flowers stamped in More Mustard. I stamped the medallion in Encore Metallic Green and embossed it with Enchanted Gold. Medallions are raised with dimensionals. The 1/2" blue center medallion is also stamped in metallic green, with brushed metal red brads in the center. The tag is the sentiment from One of a Kind, clipped on to 1/4" rust organdy ribbon with a brass swirl clip from Hodgepodge Hardware.

The original sketch called for three embellishments down the left side but I kept trying different things and nothing suited -- they just detracted from the medallions. So I decided to skip them. Overall, I'm very pleased! I struggled with the tag; I don't have any good punches and I haven't historically been happy with my tag efforts. But it works for this card. The stamping on the saffron side busied it up a little, but it was too blah without anything. And the medallions have an awesome holographic sheen. I enjoyed playing around with this sketch!